Matching of the H- beam to the low and medium energy section of the CERN Linac4

Linac4 is the near future 160 MeV H- linear accelerator of the CERN presently under construction. It will replace the present Linac2 as injector of the proton accelerator complex in CERN. The Linac4 is composed of a 45 keV ion source, a Low Energy Beam Transport (LEBT), a 352.2 MHz Radio Frequency Q... Ausführliche Beschreibung

1. Person: M Yarmohammadi Satri verfasserin
Weitere Personen: M Lamehi-Rachti verfasserin
Quelle: In Iranian Journal of Physics Research (01.08.2017)
Weitere Artikel
Format: Online-Artikel
Sprache: English
Persian
Veröffentlicht: 2017
Beschreibung: Online-Ressource
Online Zugang: Online
Online
Online
Online
Volltext
Tags: Hinzufügen
Keine Tags. Fügen Sie den ersten Tag hinzu!
  Creative Commons License Source: Directory of Open Access Journals (DOAJ).
LEADER 02037nma a2200277 c 4500
001 DOAJ015480909
003 DE-601
005 20190330024537.0
007 cr uuu---uuuuu
008 171226s2017 000 0 eng d
035 |a (DE-599)DOAJ8fd7d4a6937e4679a6e9764370461d7f 
040 |b ger  |c GBVCP 
041 0 |a eng  |a per 
100 0 |a M Yarmohammadi Satri  |e verfasserin  |4 aut 
245 1 0 |a Matching of the H- beam to the low and medium energy section of the CERN Linac4  |h Elektronische Ressource 
300 |a Online-Ressource 
520 |a Linac4 is the near future 160 MeV H- linear accelerator of the CERN presently under construction. It will replace the present Linac2 as injector of the proton accelerator complex in CERN. The Linac4 is composed of a 45 keV ion source, a Low Energy Beam Transport (LEBT), a 352.2 MHz Radio Frequency Quadrupole (RFQ), which accelerates the beam to 3 MeV, and a Medium Energy Beam Transport (MEBT), housing a beam chopper, has been installed and commissioned in the Linac4 tunnel. The LEBT is composed of two solenoids and a diagnostic box; the MEBT is composed of three Radio Frequency (RF) cavities and 11 quadrupole magnets to match and transfer the beam from the source to the RFQ and DTL, respectively. In this paper, the beam matching process of the 45 keV H- beam to the RFQ and that of accelerated 3 MeV beam to the DTL has been presented. The MEBT beam commissioning was complemented with the emittance measurement of the DTL matched beam taken with a slit-and-grid emittance measurement device located after the MEBT line 
700 0 |a M Lamehi-Rachti  |e verfasserin  |4 aut 
773 0 8 |i In  |t Iranian Journal of Physics Research  |g  (01.08.2017)  |w (DE-601)DOAJ000019755  |x 1682-6957 
856 4 0 |y DOAJ  |u https://doaj.org/article/8fd7d4a6937e4679a6e9764370461d7f 
856 4 0 |u http://ijpr.iut.ac.ir/browse.php?a_code=A-10-1-825&slc_lang=en&sid=1 
856 4 0 |u https://doaj.org/toc/1682-6957 
856 4 0 |u https://doaj.org/toc/2345-3664 
912 |a GBV_DOAJ 
951 |a AR 
952 |j 2017  |b 01  |c 08 

Ähnliche Einträge

Keine ähnlichen Titel gefunden

Privacy Notice Ask a Librarian New Acquisitions